An application was originally submitted in 2021 proposing a 16-storey residential building. The applicant appealed to the Ontario Land Tribunal (OLT) in September 2021. A settlement offer that included a height reduction from 16 to 14-storeys, along with specific step backs and set backs, and attention to tree protection was accepted. The Site Plan has also been approved.