A 13-storey mixed-use building with 171 units, and retail space fronting onto Bloor St was approved by the Toronto Local Appeal Body (TLAB) in 2022. Construction is near completion.
A 13-storey mixed-use building with 171 units, and retail space fronting onto Bloor St was approved by the Toronto Local Appeal Body (TLAB) in 2022. Construction is near completion.